South Deerfield Wastewater Treatment Plant

Wastewater PlantLocated in the heart of the picturesque Pioneer Valley in Western Massachusetts, the Town of Deerfield and the South Deerfield Wastewater TreatmentPlant both sit nestled at the foot of beautiful Mt. Sugarloaf. The state reservation atop the mountain boasts of one of the finest views in New England with the Connecticut River snaking its way south past the Holyoke Range, the majestic buildings of UMASS Amherst sprouting up from farmland, quaint South Deerfield center, and the South Deerfield Wastewater Treatment Plant all within ready view.  

The South Deerfield facility, along with scores of other treatment  plants up and down the upper Connecticut River, has been instrumental in helping to clean up New England's longest waterway over the last 40 years. What was once the butt of jokes concerning unmentionable  floatables is now a Class B river. We have much to be proud of as a people for allocating the requisite funds and training the wastewater
rofessionals necessary to make progress in this task.

Plant Type: Grade 4 extended air secondary treatment.
Owner/Operator: Town of Deerfield, MA
Design Flow: 0.85 MGD
Startup: 1971
Upgrades: 1982; added 60’ circular final clarifier and bypassed two rectangular clarifiers now used for backup only.
                  1988; added sludge dewatering using a 1-meter belt press.
                  1997; went to liquid sludge disposal due to closing of the Town landfill.
Service Population: 3000
Significant Industrial Users: None
Receiving Water: Connecticut River
Average Influent BOD Loading: 225 mg/l
Average Effluent BOD Loading:    7 mg/l
Average Percent Removal BOD: 97%


Treatment Processes:
                   Wastewater Plant

Comminutor with backup bar rack, (2) complete mix aeration tanks,  60’ Dorr-Oliver circular center-feed final clarifier, chlorine contact chamber, 9” Parshall flume, Regal vacuum chlorinators, one-ton chlorine gas container, 26,000 gal sludge holding tank, Penn Valley dual diaphragm sludge pumps, one-meter PCL belt press(idle).

Sludge Handling:
                    Sludge is concentrated to 1.5% in the bottom of the circular clarifier by shutting of the return pumps for 2-3  hours. We then pump the settled sludge to a holding tank while adding a coagulant en route using two small chemical feed pumps. The flocculated sludge settles and topwater is pumped out with a small centrifugal pump back to the headworks the next morning before our liquid sludge hauler arrives. We average 50% topwater removal which leaves us with a final sludge averaging 3.0% solids. Presently, our material is taken to Fitchburg WWTP for dewatering and incineration.


Staff: 3 Full-time; Chief Operator(Grade 6), Operator( Grade 5), Operator( Grade 4)
         Staff is also responsible for the operation of the 0.25 MGD Old Deerfield Treatment Plant.

Contact:
Donald E. Chappell, Chief Operator
South Deerfield Wastewater Treatment Plant
150 Sunderland Rd (Rt. 116)
South Deerfield, MA 01373

Tel.:    413-665-2651
Fax:    413-665-2651



Virtual Towns & Schools Website    Website Disclaimer    Privacy Policy